
GEOTIER combines geospatial, grid and planning intelligence to identify, screen and advance data centre sites across the UK and Europe, delivering construction-ready powered land with the power, planning and development carried out in-house.
GEOTIER was established by a former Google data centre executive alongside industry veterans with extensive expertise in development, design, power, planning, finance, and real estate.
We lead with technology. Our screening draws on geospatial data, grid and utility records and planning intelligence to find candidate sites, then tests each one against the conditions a data centre actually needs: available power, connection route, consent risk, fibre and ground conditions.
The output is a single product: construction-ready powered land. Planning, grid and development are carried out in-house, so what reaches a client is a zoned, serviced and connected site rather than land alone — across the UK and Europe.
As AI, cloud and hyperscale demand surges, the constraint is no longer compute. It is power. GEOTIER is built around that constraint — securing grid capacity, engineering the connection and delivering sites that are ready to carry it.
Global data centre demand is forecast to triple by 2030, driven by AI and cloud workloads.
Of new data centre projects are now constrained by power availability and grid capacity.
Gigawatts of identified, screened power capacity across the sites we are developing.
Construction-ready sites compress deployment timelines by removing land and power uncertainty.
A GEOTIER site is not a parcel of land with a promise attached. Power connection, fibre, planning and due diligence arrive as one package, so the only remaining scope is the build itself.
The work that normally stretches across separate advisers, applications and negotiations is handled inside one scope, by one team, before the site reaches you.
Grid capacity secured and the connection progressed with the operator, with headroom built in for phased growth.
Diverse fibre routes and carrier access designed in, with ducting and chambers in place for tenant fit-out.
Consent route, planning strategy and design developed to a buildable scheme, with the site zoned for digital infrastructure.
Power, grid, environmental, access and title diligence completed and packaged for your investment committee.
A repeatable development platform. We source off-market land, secure the power, and carry sites through planning to construction-ready — so clients receive verified, de-risked opportunities instead of lucky finds.
Sourcing exclusively off-market across the UK and Europe — opportunities competitors cannot see.
A purpose-built platform that models power, grid, planning, and environmental variables to surface only the highest-quality sites — repeatably, not opportunistically.
Grid capacity is verified and negotiated before a site advances — de-risking the critical path and compressing time to market.
Power, planning, design and delivery sit with one accountable team — no handoffs between advisers, so progress holds its pace.
A disciplined development process that produces construction-ready, powered sites at scale — asset after asset, across the portfolio.
Active sourcing and screening across the UK and Europe, aligned to hyperscale and colocation demand corridors.
Power-first, low-carbon infrastructure — engineered for resilience and a sustainable digital future.
Direct collaboration with utilities and transmission operators for scalable, reliable connections.
Pathways to green power procurement, on-site generation, and renewable PPAs.
Built-in redundancy and robust grid architecture for uninterrupted operations.
Land-efficient layouts, water stewardship, and low-impact development principles.
GEOTIER develops digital infrastructure on brownfield land across the UK and Europe — and we are always looking for the next site that fits.
If your site aligns with the broad criteria below, we would welcome a conversation. Every site is assessed directly and in confidence.
Priority goes to previously developed land with hardstanding, access, or utility infrastructure already in place.
We favour sites within reach of the strategic road network and a credible grid connection.
Holdings of one acre or more, capable of hosting digital infrastructure at meaningful scale.
If you own or represent land that meets our requirements, we want to hear from you. We assess every opportunity confidentially and respond directly — usually within five working days.
Whether you're looking for powered land, need advisory services, or want to discuss a site or a project — we're here to help.